India's Defence sector has lined up $8.8 billion of clean-energy and efficiency projects through 2028, according to a review of company disclosures and ministry data. About 5.6% of the pipeline is for captive or open-access renewable power, with storage and green-hydrogen pilots making up most of the rest.
Grids are the weak link. Transmission approvals and last-mile connectivity have delayed several projects by 12 months or more, and curtailment in renewable-rich regions rose 11.4% last year. A planned set of green corridors aims to address the problem, but timelines are tight.
The cost curve has moved
Measurement is a hurdle. Few mid-sized firms can currently produce audited scope-1 and scope-2 data, let alone scope-3, and consultants report a backlog of requests. Industry associations are developing a common template to reduce cost and improve comparability.
Customers are driving the change. Buyers in France and South Korea increasingly require product-level carbon data, and a carbon border mechanism in Europe is concentrating minds. Indian exporters who can demonstrate lower embodied emissions report better pricing and longer contract tenors.
By the numbers
Finance is flowing. Green bond issuance from the sector reached $388 million this year, and development banks have extended concessional lines for efficiency retrofits. Lenders are starting to price transition risk, offering lower spreads to borrowers with credible decarbonisation plans.
“Grids, not generation, will decide how fast this goes.”
Customers and carbon pricing
Green hydrogen remains early but is moving from slides to steel and concrete. A consortium including Bharat Forge has commissioned a pilot electrolyser near Mundra, with output intended for domestic fertiliser and export-grade ammonia, and the government has offered production-linked support for the first tranche.
Source: IGEN Intelligence analysis of ministry of commerce & industry data. Illustrative mock data.
Policy support continues. The latest budget extended accelerated depreciation for efficiency equipment and allocated $8.8 billion to transmission and storage. Industry bodies welcomed the measures but asked for faster clearance of open-access applications and a standard wheeling charge across states.
| Technology | Capacity | Capex | Online by |
|---|---|---|---|
| Solar + storage (captive) | 408 MW | $0.4B | 2030 |
| Wind-hybrid (open access) | 841 MW | $2.8B | 2030 |
| Green hydrogen pilot | 271 MW | $3.8B | 2030 |
| Efficiency retrofits | 658 MW | $2.8B | 2028 |
| Biomass co-firing | 71 MW | $0.4B | 2028 |
Storage, hydrogen and the grid
Storage is the next lever. Pilot battery installations of 1,206 megawatt-hours at industrial sites are being used to shift load and avoid peak charges, and developers expect costs to fall another 11.4% by 2028. Regulators are drafting rules to let storage participate in ancillary markets.
Timeline of key events
- Open-access rules eased
Large consumers allowed to contract renewable power across state lines.
- First 25-year PPA
Bharat Forge locks in power 11.4% below its average cost.
- Electrolyser commissioned
Pilot near Mundra starts producing green hydrogen.
- Compliance scheme begins
Large emitters enter domestic carbon trading from Q3 FY27.
- Green corridors due
Transmission upgrades targeted for completion by 2028.
The economics have shifted markedly. Delivered cost of firm renewable power for industrial users fell 11.6% over two years, and in several states now undercuts grid tariffs for large consumers. Bharat Forge said its latest 25-year agreement locks in power at about 11.4% below its current average cost.
Expert commentary
“If you cannot measure your emissions, you cannot sell to Europe in three years.”
“In my conversations with procurement heads, reliability is mentioned three times for every mention of price.”
“Buyers are paying a premium for certainty. Suppliers who can document, deliver and communicate will capture it.”
Finance and the outlook
The outlook is for steady progress rather than a step change. Analysts expect the sector's emissions intensity to fall by about 5.6% by 2028 if announced projects proceed, with the largest improvements coming from power procurement rather than process change.
What it means for you
Evaluate open-access renewable contracts and begin audited emissions accounting for product-level disclosure.
Prepare carbon-border documentation; lower embodied emissions are becoming a pricing advantage.
Storage, transmission and measurement services offer opportunities beyond generation.
Price transition risk explicitly; credible decarbonisation plans merit sharper spreads.
Companies and leaders in this story
Frequently asked questions
Sources
- Ministry of Commerce & Industry: Monthly trade statistics and notifications
- Company filings and earnings calls: Disclosures on order books and capex
- Industry association surveys: Member-level compliance and sentiment data
- Central Board of Indirect Taxes & Customs: Port-level clearance and dwell data
Mock content for demonstration. Names, figures and quotes are illustrative and not real reporting.