India's Energy sector has lined up $4.4 billion of clean-energy and efficiency projects through 2028, according to a review of company disclosures and ministry data. About 4.7% of the pipeline is for captive or open-access renewable power, with storage and green-hydrogen pilots making up most of the rest.
Green hydrogen remains early but is moving from slides to steel and concrete. A consortium including Infosys has commissioned a pilot electrolyser near Visakhapatnam, with output intended for domestic fertiliser and export-grade ammonia, and the government has offered production-linked support for the first tranche.
The cost curve has moved
Finance is flowing. Green bond issuance from the sector reached $154 million this year, and development banks have extended concessional lines for efficiency retrofits. Lenders are starting to price transition risk, offering lower spreads to borrowers with credible decarbonisation plans.
Carbon markets are maturing. The domestic compliance scheme will cover large emitters in the sector from Q3 FY27, and early trading in voluntary credits suggests prices of about $154 million per hundred tonnes. Companies are building internal carbon accounting teams, drawing talent from consulting and utilities.
By the numbers
The outlook is for steady progress rather than a step change. Analysts expect the sector's emissions intensity to fall by about 4.7% by 2028 if announced projects proceed, with the largest improvements coming from power procurement rather than process change.
“Grids, not generation, will decide how fast this goes.”
Customers and carbon pricing
Policy support continues. The latest budget extended accelerated depreciation for efficiency equipment and allocated $4.4 billion to transmission and storage. Industry bodies welcomed the measures but asked for faster clearance of open-access applications and a standard wheeling charge across states.
Source: IGEN Intelligence analysis of igen intelligence database data. Illustrative mock data.
Grids are the weak link. Transmission approvals and last-mile connectivity have delayed several projects by 12 months or more, and curtailment in renewable-rich regions rose 5.5% last year. A planned set of green corridors aims to address the problem, but timelines are tight.
| Technology | Capacity | Capex | Online by |
|---|---|---|---|
| Solar + storage (captive) | 534 MW | $1.3B | 2030 |
| Wind-hybrid (open access) | 593 MW | $5.4B | 2028 |
| Green hydrogen pilot | 494 MW | $4.6B | 2029 |
| Efficiency retrofits | 717 MW | $1.5B | 2028 |
| Biomass co-firing | 119 MW | $3.2B | 2029 |
Storage, hydrogen and the grid
Customers are driving the change. Buyers in Australia and Indonesia increasingly require product-level carbon data, and a carbon border mechanism in Europe is concentrating minds. Indian exporters who can demonstrate lower embodied emissions report better pricing and longer contract tenors.
Timeline of key events
- Open-access rules eased
Large consumers allowed to contract renewable power across state lines.
- First 25-year PPA
Infosys locks in power 5.5% below its average cost.
- Electrolyser commissioned
Pilot near Visakhapatnam starts producing green hydrogen.
- Compliance scheme begins
Large emitters enter domestic carbon trading from Q3 FY27.
- Green corridors due
Transmission upgrades targeted for completion by 2028.
The economics have shifted markedly. Delivered cost of firm renewable power for industrial users fell 14.3% over two years, and in several states now undercuts grid tariffs for large consumers. Infosys said its latest 25-year agreement locks in power at about 5.5% below its current average cost.
Expert commentary
“The business case for renewable power in industry is no longer about virtue. It is about cost and market access.”
“The data is clear on direction and less clear on pace. I would plan for slower and be pleasantly surprised.”
“Firms that treat this as a compliance exercise will keep up. Firms that treat it as a design problem will pull ahead.”
Finance and the outlook
Measurement is a hurdle. Few mid-sized firms can currently produce audited scope-1 and scope-2 data, let alone scope-3, and consultants report a backlog of requests. Industry associations are developing a common template to reduce cost and improve comparability.
What it means for you
Evaluate open-access renewable contracts and begin audited emissions accounting for product-level disclosure.
Prepare carbon-border documentation; lower embodied emissions are becoming a pricing advantage.
Storage, transmission and measurement services offer opportunities beyond generation.
Price transition risk explicitly; credible decarbonisation plans merit sharper spreads.
Companies and leaders in this story
Frequently asked questions
Sources
- IGEN Intelligence database: Proprietary tracker of announced projects
- Central Board of Indirect Taxes & Customs: Port-level clearance and dwell data
- Industry association surveys: Member-level compliance and sentiment data
- Ministry of Commerce & Industry: Monthly trade statistics and notifications
Mock content for demonstration. Names, figures and quotes are illustrative and not real reporting.