India Global News
Visit iGEN World(opens in a new tab)Explore iGEN Expo(opens in a new tab)
AI Plus
India Global News
Explore Upgrade Plan
Sign InRegister
Breaking
India signs $2B semiconductor deal with Netherlands — ASML to set up training center in BangaloreRBI holds rates steady at 6.5% — Export sector welcomes stability amid global uncertaintyIndia-UAE CEPA crosses $100B trade milestone — Services exports surge 40% YoYEuropean Central Bank signals digital euro interoperability with cross-border trade railsNASA commercial space expo unlocks $12B procurement pipeline for private aerospace corridorsIndia signs $2B semiconductor deal with Netherlands — ASML to set up training center in BangaloreRBI holds rates steady at 6.5% — Export sector welcomes stability amid global uncertaintyIndia-UAE CEPA crosses $100B trade milestone — Services exports surge 40% YoYEuropean Central Bank signals digital euro interoperability with cross-border trade railsNASA commercial space expo unlocks $12B procurement pipeline for private aerospace corridors
Back to News FeedInfrastructureBottleneck Watch: What Is Slowing Infrastructure Shipments Out of Kandla
TradeS36 · Infrastructure & ConstructionFreeSummary

Bottleneck Watch: What Is Slowing Infrastructure Shipments Out of Kandla

Faster clearance, new rail links and warehouse automation are rewriting the cost structure of moving Infrastructure goods, but last-mile gaps persist.

MI
Meera IyerVERIFIED
Senior Trade Correspondent, IGEN News
8 Oct 2026, 14:22 IST4 min read9.5K views

Updated 9 Oct 2026, 19:42 IST

Infrastructure & Construction: illustrative image for "Bottleneck Watch: What Is Slowing Infrastructure Shipments Out of Kandla"
Railways and infrastructure: illustrative image for Infrastructure coverage. Photo: Unsplash.
215
3
Sponsored

Trade finance for exporters: invoice discounting in 48 hours (partner content).

Average container dwell time at Kandla fell to 48 hours in the latest monthly reading, down from 62 hours a year earlier, according to port authority data. For Infrastructure shippers, whose cargo is often time-sensitive and high in value, the improvement has translated into measurable savings on demurrage and inventory carrying costs.

Policy is encouraging the shift. The national logistics plan sets a target of cutting logistics cost to single digits as a share of output, and the latest budget allocated $8.3 billion to multimodal parks and port connectivity. Industry groups welcome the intent but want faster land-acquisition clearances.

Key takeaways

  • Physical inspection rates dropped to 2.1% under risk-based clearance.
  • Container dwell time at Kandla fell to 48 hours from 62 a year ago.
  • Modern warehouse occupancy is above 90 percent as rents climb 2.1%.
  • Last-mile trucking is the weakest link; goods wait days for a truck after clearing in hours.
  • Rail now carries 11.1% of sector export volume on the new corridor.

What changed at the port

Not every link has kept pace. Last-mile trucking remains fragmented, with small operators accounting for most capacity and little data sharing. Several exporters reported that goods cleared in 24 hours then waited three days for a truck, eroding much of the benefit achieved upstream.

Beyond the port gate, rail is taking a larger role. A dedicated freight corridor connecting Kandla to inland container depots now carries 11.1% of the sector's export volume, and double-stack services have cut inland transit to under 36 hours for the first time. Rates are competitive with road once total delivered cost is considered.

By the numbers

Dwell time
42 hrs
-24 hrs YoY
average container dwell
Inspection rate
3%
-4 pts
physical inspection rate
Rail share
16.3%
+9 pts
export volume by rail
Logistics saving
7.7%
cost cut
logistics spend saved

The next phase will be about data. Ports, railways and shippers are working on a shared visibility platform, and a pilot at Kandla will go live next quarter. If it works, exporters will be able to track a container from factory gate to destination port in a single interface.

“The port is no longer the problem. The problem is everything that happens in the 200 kilometres after the gate.”

Karthik Subramanian, Logistics & Ports Reporter

Rail, warehousing and the middle mile

Resilience is now a boardroom topic. After repeated disruptions in global shipping lanes, buyers in Vietnam and UAE have asked suppliers to document contingency routes. Indian exporters with alternative gateways at two or more ports are winning preferred-supplier status in several categories.

Average container dwell time at Kandlahours
Average container dwell time at KandlaAverage container dwell time at Kandla: from 25.1 hours in W1 to 17.4 hours in W8; high 25.1 in W1, low 17.4 in W8.15.71820.422.725.125.1W1W2W3W420.3W5W6W717.4W8

Source: IGEN Intelligence analysis of port authority statistics data. Illustrative mock data.

The gains are largely procedural. Pre-arrival processing, risk-based inspection and paperless clearance now cover most consignments, and the share of containers selected for physical examination has fallen to 2.1%. Customs brokers say the biggest change is predictability: clearance windows can now be planned rather than hoped for.

Gateway performance comparison
GatewayDwell (hrs)Rail shareInspection rate
Mundra3117.5%5.9%
Nhava Sheva5723.7%4.2%
Chennai629.6%2.7%
Kolkata3317.8%6.1%
Visakhapatnam5321.5%2.5%
Source: Company filings and earnings calls; IGEN estimates. Figures are illustrative mock data.

The gaps that remain

Warehousing is evolving in parallel. Grade-A capacity near Kandla reached 717 thousand square metres this year, with new facilities offering temperature control and bonded storage. Rents have climbed 2.1%, but occupancy at modern sites is above 90 percent, pointing to unmet demand.

Timeline of key events

  1. 14 Sep 2026
    Paperless clearance

    Electronic documents become mandatory for all containerised exports.

  2. 20 Sep 2026
    Rail corridor opens

    Double-stack services begin between Kandla and the inland depot.

  3. 26 Sep 2026
    Network redesign

    Hindalco Industries consolidates three warehouses into one automated hub.

  4. 2 Oct 2026
    Dwell hits low

    Average dwell time drops to 48 hours, a multi-year low.

  5. 8 Oct 2026
    Visibility pilot

    Port, rail and shippers begin a shared tracking pilot.

Insurance and finance are adapting. Cargo insurers have begun offering parametric products that pay out automatically when a vessel is delayed beyond a threshold, and banks are experimenting with receivables finance triggered by electronic bills of lading, which could shorten cash cycles by two to three weeks.

Expert commentary

“Predictability beats speed. A two-day clearance you can plan around is worth more than a one-day clearance you cannot.”

AA
Aisha Al Mansoori
Director, Corridor Strategy, Gulf Trade Council

“The risk I would watch is a sudden policy move in Vietnam. Everything else can be hedged or absorbed.”

KS
Karthik Subramanian
Logistics & Ports Reporter, IGEN News

“What matters now is execution. The announcements are in place; the next two quarters will show who can deliver.”

RD
Rohan Deshpande
Markets Editor, IGEN News

Where the next savings are

Hindalco Industries said it redesigned its network around the new corridor, consolidating three regional warehouses into one automated hub and shifting 4.3% of its volume to rail. The company estimates a saving of $397 million a year and a reduction in emissions intensity of roughly 2.1%, a point increasingly requested by European customers.

What it means for you

Shippers

Move to paperless clearance and book rail slots in advance; consider a second gateway for contingency.

Logistics providers

Invest in data integration with customs and ports; fragmented last-mile operators should consider consortium models.

Warehouse investors

Demand for bonded and temperature-controlled space near gateways outstrips supply; underwrite at current rents.

Buyers abroad

Ask suppliers for documented contingency routes and track transit via the new visibility tools as they roll out.

Companies and leaders in this story

Hindalco Industries Wipro Reliance Industries Havells India Nikhil Kamath Rakesh Bhargava

Frequently asked questions

To 48 hours at Kandla, from 62 hours a year earlier, driven mainly by paperless clearance and risk-based inspection.

Sources

  1. Port authority statistics: Container volumes, dwell times and berth productivity
  2. Company filings and earnings calls: Disclosures on order books and capex
  3. UN Comtrade: Bilateral trade flows by HS code
  4. IGEN Intelligence database: Proprietary tracker of announced projects

Mock content for demonstration. Names, figures and quotes are illustrative and not real reporting.

#Infrastructure#SupplyChain#Logistics#Ports#Vietnam
MI
Written by

Meera Iyer

Senior Trade Correspondent, IGEN News

Covers bilateral trade corridors, customs reform and export finance. Previously a commodities desk reporter in Mumbai.

Source & Editorial Attribution

Ministry of Housing & Urban Affairs · IGEN Trade Intelligence

This article is curated and summarized by the IGEN editorial desk. All text is verified from official filings and trade bulletins, rendered strictly in plain text for compliance and clarity. Full text and regulatory updates are archived in the national registry.

Daily briefing

Get stories like this in your inbox

One concise email each morning on trade, policy and markets across Infrastructure and 49 other sectors.

Discussion (3)

Sort by: Most recent
Log in to comment
F
Faisal Khan
38m ago

Agree with the expert on diversification. Two gateways saved us last quarter.

T
Tanvi Joshi
2h ago

Good to see concrete figures instead of generalities. The table on destination markets is especially helpful.

A
Ankit Sharma
5h ago

The point about documentation holds true on the ground. Our forwarder has already seen holds from template mismatches.

In this article
  1. 1. What changed at the port
  2. 2. Rail, warehousing and the middle mile
  3. 3. The gaps that remain
  4. 4. Where the next savings are
  5. 5. Discussion (3)

Trending now

  1. 01FinTech Goes Green: $8.2 billion Pipeline of Clean-Energy Projects Reshapes Cost Curves
  2. 02Mahindra Group Commits $4.7 billion to Film Making Expansion as Global Customers Seek a Second Source
  3. 03Leadership Lens: Nikhil Kamath on Talent, Capital and the Next Logistics Cycle
  4. 04Asian Paints and Sun Pharma Sign Long-Term Supply Pact in Heavy Industries
  5. 05AI Meets Ports: Early Adopters Report 4.1% Productivity Gains
Topic
S36 · Infrastructure & Construction

Ministry of Housing & Urban Affairs

VietnamUAE

More to read

All headlines →
Sector · FinTech

FinTech Goes Green: $8.2 billion Pipeline of Clean-Energy Projects Reshapes Cost Curves

4 min read
Company · Film Making

Mahindra Group Commits $4.7 billion to Film Making Expansion as Global Customers Seek a Second Source

4 min read
Leader · Logistics

Leadership Lens: Nikhil Kamath on Talent, Capital and the Next Logistics Cycle

6 min read
Company · Heavy Industries

Asian Paints and Sun Pharma Sign Long-Term Supply Pact in Heavy Industries

7 min read
Company · Ports

AI Meets Ports: Early Adopters Report 4.1% Productivity Gains

7 min read
Technology · Startups

Sun Pharma Commits $3.2 billion to Startups Expansion as Global Customers Seek a Second Source

8 min read
India Global News

The premier institutional platform for global trade intelligence. Empowering 50,000+ professionals with real-time insights, bilateral trade corridors, and predictive analytics across 195 countries.

Stay Ahead of the Curve

Get daily trade intelligence briefings delivered to your inbox. Join 50k+ leaders. Delivered fresh before market opening.

Secure subscription. No spam. Strict data privacy.

Platform

  • Headlines
  • Trending
  • Company News
  • Leader News
  • Expert News
  • Sector News
  • Country News
  • Communities

Intelligence

  • Executive Decision Signals
  • Trade Policy Tracker
  • Bilateral Corridor Matrix
  • Live FDI & Capital Tracker
  • 60 Industrial Sectors
  • Predictive Signals

Events & Expo

  • Expert AMAs & Webinars
  • Executive Roundtables
  • Global Trade Summits
  • B2B Expo Network

Company

  • About iGEN
  • Membership Plans
  • Corporate Directory
  • CareersHiring
  • Contact
  • Advertise

Get In Touch

  • +91 11 4567 8900
  • contact@indiaglobalnews.org
  • New Delhi, India

© 2026 India Global News. All rights reserved.

iGEN is a registered trademark of Global Trade Intelligence Corp.

  • Privacy Policy
  • Terms of Service
  • Cookie Policy
  • Sitemap
System Operational
FeedCountryLeaderSearchProfile
📱Feed
🔥Headlines
📈Trending
🏢Company News
👑Leader News
🎓Expert News
🏭Sector News
🌐Country News
🤝Communities
👤My News
Back to News FeedInfrastructureBottleneck Watch: What Is Slowing Infrastructure Shipments Out of Kandla
TradeS36 · Infrastructure & ConstructionFreeSummary

Bottleneck Watch: What Is Slowing Infrastructure Shipments Out of Kandla

Faster clearance, new rail links and warehouse automation are rewriting the cost structure of moving Infrastructure goods, but last-mile gaps persist.

MI
Meera IyerVERIFIED
Senior Trade Correspondent, IGEN News
8 Oct 2026, 14:22 IST4 min read9.5K views

Updated 9 Oct 2026, 19:42 IST

Infrastructure & Construction: illustrative image for "Bottleneck Watch: What Is Slowing Infrastructure Shipments Out of Kandla"
Railways and infrastructure: illustrative image for Infrastructure coverage. Photo: Unsplash.
215
3
Sponsored

Trade finance for exporters: invoice discounting in 48 hours (partner content).

Average container dwell time at Kandla fell to 48 hours in the latest monthly reading, down from 62 hours a year earlier, according to port authority data. For Infrastructure shippers, whose cargo is often time-sensitive and high in value, the improvement has translated into measurable savings on demurrage and inventory carrying costs.

Policy is encouraging the shift. The national logistics plan sets a target of cutting logistics cost to single digits as a share of output, and the latest budget allocated $8.3 billion to multimodal parks and port connectivity. Industry groups welcome the intent but want faster land-acquisition clearances.

Key takeaways

  • Physical inspection rates dropped to 2.1% under risk-based clearance.
  • Container dwell time at Kandla fell to 48 hours from 62 a year ago.
  • Modern warehouse occupancy is above 90 percent as rents climb 2.1%.
  • Last-mile trucking is the weakest link; goods wait days for a truck after clearing in hours.
  • Rail now carries 11.1% of sector export volume on the new corridor.

What changed at the port

Not every link has kept pace. Last-mile trucking remains fragmented, with small operators accounting for most capacity and little data sharing. Several exporters reported that goods cleared in 24 hours then waited three days for a truck, eroding much of the benefit achieved upstream.

Beyond the port gate, rail is taking a larger role. A dedicated freight corridor connecting Kandla to inland container depots now carries 11.1% of the sector's export volume, and double-stack services have cut inland transit to under 36 hours for the first time. Rates are competitive with road once total delivered cost is considered.

By the numbers

Dwell time
42 hrs
-24 hrs YoY
average container dwell
Inspection rate
3%
-4 pts
physical inspection rate
Rail share
16.3%
+9 pts
export volume by rail
Logistics saving
7.7%
cost cut
logistics spend saved

The next phase will be about data. Ports, railways and shippers are working on a shared visibility platform, and a pilot at Kandla will go live next quarter. If it works, exporters will be able to track a container from factory gate to destination port in a single interface.

“The port is no longer the problem. The problem is everything that happens in the 200 kilometres after the gate.”

Karthik Subramanian, Logistics & Ports Reporter

Rail, warehousing and the middle mile

Resilience is now a boardroom topic. After repeated disruptions in global shipping lanes, buyers in Vietnam and UAE have asked suppliers to document contingency routes. Indian exporters with alternative gateways at two or more ports are winning preferred-supplier status in several categories.

Average container dwell time at Kandlahours
Average container dwell time at KandlaAverage container dwell time at Kandla: from 25.1 hours in W1 to 17.4 hours in W8; high 25.1 in W1, low 17.4 in W8.15.71820.422.725.125.1W1W2W3W420.3W5W6W717.4W8

Source: IGEN Intelligence analysis of port authority statistics data. Illustrative mock data.

The gains are largely procedural. Pre-arrival processing, risk-based inspection and paperless clearance now cover most consignments, and the share of containers selected for physical examination has fallen to 2.1%. Customs brokers say the biggest change is predictability: clearance windows can now be planned rather than hoped for.

Gateway performance comparison
GatewayDwell (hrs)Rail shareInspection rate
Mundra3117.5%5.9%
Nhava Sheva5723.7%4.2%
Chennai629.6%2.7%
Kolkata3317.8%6.1%
Visakhapatnam5321.5%2.5%
Source: Company filings and earnings calls; IGEN estimates. Figures are illustrative mock data.

The gaps that remain

Warehousing is evolving in parallel. Grade-A capacity near Kandla reached 717 thousand square metres this year, with new facilities offering temperature control and bonded storage. Rents have climbed 2.1%, but occupancy at modern sites is above 90 percent, pointing to unmet demand.

Timeline of key events

  1. 14 Sep 2026
    Paperless clearance

    Electronic documents become mandatory for all containerised exports.

  2. 20 Sep 2026
    Rail corridor opens

    Double-stack services begin between Kandla and the inland depot.

  3. 26 Sep 2026
    Network redesign

    Hindalco Industries consolidates three warehouses into one automated hub.

  4. 2 Oct 2026
    Dwell hits low

    Average dwell time drops to 48 hours, a multi-year low.

  5. 8 Oct 2026
    Visibility pilot

    Port, rail and shippers begin a shared tracking pilot.

Insurance and finance are adapting. Cargo insurers have begun offering parametric products that pay out automatically when a vessel is delayed beyond a threshold, and banks are experimenting with receivables finance triggered by electronic bills of lading, which could shorten cash cycles by two to three weeks.

Expert commentary

“Predictability beats speed. A two-day clearance you can plan around is worth more than a one-day clearance you cannot.”

AA
Aisha Al Mansoori
Director, Corridor Strategy, Gulf Trade Council

“The risk I would watch is a sudden policy move in Vietnam. Everything else can be hedged or absorbed.”

KS
Karthik Subramanian
Logistics & Ports Reporter, IGEN News

“What matters now is execution. The announcements are in place; the next two quarters will show who can deliver.”

RD
Rohan Deshpande
Markets Editor, IGEN News

Where the next savings are

Hindalco Industries said it redesigned its network around the new corridor, consolidating three regional warehouses into one automated hub and shifting 4.3% of its volume to rail. The company estimates a saving of $397 million a year and a reduction in emissions intensity of roughly 2.1%, a point increasingly requested by European customers.

What it means for you

Shippers

Move to paperless clearance and book rail slots in advance; consider a second gateway for contingency.

Logistics providers

Invest in data integration with customs and ports; fragmented last-mile operators should consider consortium models.

Warehouse investors

Demand for bonded and temperature-controlled space near gateways outstrips supply; underwrite at current rents.

Buyers abroad

Ask suppliers for documented contingency routes and track transit via the new visibility tools as they roll out.

Companies and leaders in this story

Hindalco Industries Wipro Reliance Industries Havells India Nikhil Kamath Rakesh Bhargava

Frequently asked questions

To 48 hours at Kandla, from 62 hours a year earlier, driven mainly by paperless clearance and risk-based inspection.

Sources

  1. Port authority statistics: Container volumes, dwell times and berth productivity
  2. Company filings and earnings calls: Disclosures on order books and capex
  3. UN Comtrade: Bilateral trade flows by HS code
  4. IGEN Intelligence database: Proprietary tracker of announced projects

Mock content for demonstration. Names, figures and quotes are illustrative and not real reporting.

#Infrastructure#SupplyChain#Logistics#Ports#Vietnam
MI
Written by

Meera Iyer

Senior Trade Correspondent, IGEN News

Covers bilateral trade corridors, customs reform and export finance. Previously a commodities desk reporter in Mumbai.

Source & Editorial Attribution

Ministry of Housing & Urban Affairs · IGEN Trade Intelligence

This article is curated and summarized by the IGEN editorial desk. All text is verified from official filings and trade bulletins, rendered strictly in plain text for compliance and clarity. Full text and regulatory updates are archived in the national registry.

Daily briefing

Get stories like this in your inbox

One concise email each morning on trade, policy and markets across Infrastructure and 49 other sectors.

Discussion (3)

Sort by: Most recent
Log in to comment
F
Faisal Khan
38m ago

Agree with the expert on diversification. Two gateways saved us last quarter.

T
Tanvi Joshi
2h ago

Good to see concrete figures instead of generalities. The table on destination markets is especially helpful.

A
Ankit Sharma
5h ago

The point about documentation holds true on the ground. Our forwarder has already seen holds from template mismatches.

In this article
  1. 1. What changed at the port
  2. 2. Rail, warehousing and the middle mile
  3. 3. The gaps that remain
  4. 4. Where the next savings are
  5. 5. Discussion (3)

Trending now

  1. 01FinTech Goes Green: $8.2 billion Pipeline of Clean-Energy Projects Reshapes Cost Curves
  2. 02Mahindra Group Commits $4.7 billion to Film Making Expansion as Global Customers Seek a Second Source
  3. 03Leadership Lens: Nikhil Kamath on Talent, Capital and the Next Logistics Cycle
  4. 04Asian Paints and Sun Pharma Sign Long-Term Supply Pact in Heavy Industries
  5. 05AI Meets Ports: Early Adopters Report 4.1% Productivity Gains
Topic
S36 · Infrastructure & Construction

Ministry of Housing & Urban Affairs

VietnamUAE

More to read

All headlines →
Sector · FinTech

FinTech Goes Green: $8.2 billion Pipeline of Clean-Energy Projects Reshapes Cost Curves

4 min read
Company · Film Making

Mahindra Group Commits $4.7 billion to Film Making Expansion as Global Customers Seek a Second Source

4 min read
Leader · Logistics

Leadership Lens: Nikhil Kamath on Talent, Capital and the Next Logistics Cycle

6 min read
Company · Heavy Industries

Asian Paints and Sun Pharma Sign Long-Term Supply Pact in Heavy Industries

7 min read
Company · Ports

AI Meets Ports: Early Adopters Report 4.1% Productivity Gains

7 min read
Technology · Startups

Sun Pharma Commits $3.2 billion to Startups Expansion as Global Customers Seek a Second Source

8 min read