India Global News
Visit iGEN World(opens in a new tab)Explore iGEN Expo(opens in a new tab)
AI Plus
India Global News
Explore Upgrade Plan
Sign InRegister
Breaking
India signs $2B semiconductor deal with Netherlands — ASML to set up training center in BangaloreRBI holds rates steady at 6.5% — Export sector welcomes stability amid global uncertaintyIndia-UAE CEPA crosses $100B trade milestone — Services exports surge 40% YoYEuropean Central Bank signals digital euro interoperability with cross-border trade railsNASA commercial space expo unlocks $12B procurement pipeline for private aerospace corridorsIndia signs $2B semiconductor deal with Netherlands — ASML to set up training center in BangaloreRBI holds rates steady at 6.5% — Export sector welcomes stability amid global uncertaintyIndia-UAE CEPA crosses $100B trade milestone — Services exports surge 40% YoYEuropean Central Bank signals digital euro interoperability with cross-border trade railsNASA commercial space expo unlocks $12B procurement pipeline for private aerospace corridors
Back to News FeedManufacturingBottleneck Watch: What Is Slowing Manufacturing Shipments Out of Visakhapatnam
TradeS38 · ManufacturingFreeSummary

Bottleneck Watch: What Is Slowing Manufacturing Shipments Out of Visakhapatnam

Faster clearance, new rail links and warehouse automation are rewriting the cost structure of moving Manufacturing goods, but last-mile gaps persist.

MI
Meera IyerVERIFIED
Senior Trade Correspondent, IGEN News
24 Oct 2026, 11:06 IST5 min read4.9K views

Updated 24 Oct 2026, 16:26 IST

Manufacturing: illustrative image for "Bottleneck Watch: What Is Slowing Manufacturing Shipments Out of Visakhapatnam"
Steel, metals and heavy industry: illustrative image for Manufacturing coverage. Photo: Unsplash.
319
3
Sponsored

Trade finance for exporters: invoice discounting in 48 hours (partner content).

Average container dwell time at Visakhapatnam fell to 90 hours in the latest monthly reading, down from 62 hours a year earlier, according to port authority data. For Manufacturing shippers, whose cargo is often time-sensitive and high in value, the improvement has translated into measurable savings on demurrage and inventory carrying costs.

The next phase will be about data. Ports, railways and shippers are working on a shared visibility platform, and a pilot at Visakhapatnam will go live next quarter. If it works, exporters will be able to track a container from factory gate to destination port in a single interface.

Key takeaways

  • Last-mile trucking is the weakest link; goods wait days for a truck after clearing in hours.
  • Modern warehouse occupancy is above 90 percent as rents climb 5.8%.
  • Rail now carries 32.4% of sector export volume on the new corridor.
  • Physical inspection rates dropped to 5.8% under risk-based clearance.
  • Container dwell time at Visakhapatnam fell to 90 hours from 62 a year ago.

What changed at the port

The gains are largely procedural. Pre-arrival processing, risk-based inspection and paperless clearance now cover most consignments, and the share of containers selected for physical examination has fallen to 5.8%. Customs brokers say the biggest change is predictability: clearance windows can now be planned rather than hoped for.

Resilience is now a boardroom topic. After repeated disruptions in global shipping lanes, buyers in France and Brazil have asked suppliers to document contingency routes. Indian exporters with alternative gateways at two or more ports are winning preferred-supplier status in several categories.

By the numbers

Dwell time
44 hrs
-24 hrs YoY
average container dwell
Inspection rate
3.4%
-4 pts
physical inspection rate
Rail share
30.1%
+9 pts
export volume by rail
Logistics saving
6%
cost cut
logistics spend saved

Infosys said it redesigned its network around the new corridor, consolidating three regional warehouses into one automated hub and shifting 8% of its volume to rail. The company estimates a saving of $248 million a year and a reduction in emissions intensity of roughly 5.8%, a point increasingly requested by European customers.

“Resilience is becoming a commercial differentiator, not a cost centre.”

Lakshmi Venkatesan, Agri & Food Trade Reporter

Rail, warehousing and the middle mile

Beyond the port gate, rail is taking a larger role. A dedicated freight corridor connecting Visakhapatnam to inland container depots now carries 32.4% of the sector's export volume, and double-stack services have cut inland transit to under 36 hours for the first time. Rates are competitive with road once total delivered cost is considered.

Average container dwell time at Visakhapatnamhours
Average container dwell time at VisakhapatnamAverage container dwell time at Visakhapatnam: from 35 hours in W1 to 25.2 hours in W8; high 35 in W1, low 25.2 in W8.22.725.828.831.93535W1W2W3W428.5W5W6W725.2W8

Source: IGEN Intelligence analysis of ministry-level press releases data. Illustrative mock data.

Warehousing is evolving in parallel. Grade-A capacity near Visakhapatnam reached 696 thousand square metres this year, with new facilities offering temperature control and bonded storage. Rents have climbed 5.8%, but occupancy at modern sites is above 90 percent, pointing to unmet demand.

Gateway performance comparison
GatewayDwell (hrs)Rail shareInspection rate
Mundra7013%1.9%
Nhava Sheva4822.6%2.1%
Chennai5316.4%2.4%
Kolkata7115.3%6.9%
Visakhapatnam4112.5%3%
Source: IGEN Intelligence database; IGEN estimates. Figures are illustrative mock data.

The gaps that remain

Insurance and finance are adapting. Cargo insurers have begun offering parametric products that pay out automatically when a vessel is delayed beyond a threshold, and banks are experimenting with receivables finance triggered by electronic bills of lading, which could shorten cash cycles by two to three weeks.

Timeline of key events

  1. 6 Sep 2026
    Paperless clearance

    Electronic documents become mandatory for all containerised exports.

  2. 18 Sep 2026
    Rail corridor opens

    Double-stack services begin between Visakhapatnam and the inland depot.

  3. 30 Sep 2026
    Network redesign

    Infosys consolidates three warehouses into one automated hub.

  4. 12 Oct 2026
    Dwell hits low

    Average dwell time drops to 90 hours, a multi-year low.

  5. 24 Oct 2026
    Visibility pilot

    Port, rail and shippers begin a shared tracking pilot.

Technology adoption is uneven. Large shippers have integrated customs, transport and inventory systems and receive alerts on delays in near real time; smaller firms still rely on email and phone calls. Logistics platforms are targeting this gap with subscription tools priced for firms with fewer than 50 shipments a month.

Expert commentary

“Predictability beats speed. A two-day clearance you can plan around is worth more than a one-day clearance you cannot.”

NB
Dr. Neha Bhatia
Technology Policy Fellow, Institute for Digital Trade

“The data is clear on direction and less clear on pace. I would plan for slower and be pleasantly surprised.”

LV
Lakshmi Venkatesan
Agri & Food Trade Reporter, IGEN News

“What matters now is execution. The announcements are in place; the next two quarters will show who can deliver.”

DM
Divya Menon
Partner, Customs & Trade Law, Menon & Partners

Where the next savings are

Policy is encouraging the shift. The national logistics plan sets a target of cutting logistics cost to single digits as a share of output, and the latest budget allocated $2.5 billion to multimodal parks and port connectivity. Industry groups welcome the intent but want faster land-acquisition clearances.

What it means for you

Shippers

Move to paperless clearance and book rail slots in advance; consider a second gateway for contingency.

Logistics providers

Invest in data integration with customs and ports; fragmented last-mile operators should consider consortium models.

Warehouse investors

Demand for bonded and temperature-controlled space near gateways outstrips supply; underwrite at current rents.

Buyers abroad

Ask suppliers for documented contingency routes and track transit via the new visibility tools as they roll out.

Companies and leaders in this story

Infosys Larsen & Toubro Titan Company Bharat Forge Rakesh Bhargava Sudha Raghavan

Frequently asked questions

To 90 hours at Visakhapatnam, from 62 hours a year earlier, driven mainly by paperless clearance and risk-based inspection.

Sources

  1. Ministry-level press releases: Scheme guidelines and cabinet decisions
  2. IGEN Intelligence database: Proprietary tracker of announced projects
  3. Directorate General of Foreign Trade: Export-import policy and public notices
  4. Central Board of Indirect Taxes & Customs: Port-level clearance and dwell data

Mock content for demonstration. Names, figures and quotes are illustrative and not real reporting.

#Manufacturing#SupplyChain#Logistics#Ports#France
MI
Written by

Meera Iyer

Senior Trade Correspondent, IGEN News

Covers bilateral trade corridors, customs reform and export finance. Previously a commodities desk reporter in Mumbai.

Source & Editorial Attribution

Ministry of Commerce & Industry · IGEN Trade Intelligence

This article is curated and summarized by the IGEN editorial desk. All text is verified from official filings and trade bulletins, rendered strictly in plain text for compliance and clarity. Full text and regulatory updates are archived in the national registry.

Daily briefing

Get stories like this in your inbox

One concise email each morning on trade, policy and markets across Manufacturing and 49 other sectors.

Discussion (3)

Sort by: Most recent
Log in to comment
F
Faisal Khan
38m ago

Agree with the expert on diversification. Two gateways saved us last quarter.

T
Tanvi Joshi
2h ago

Good to see concrete figures instead of generalities. The table on destination markets is especially helpful.

A
Ankit Sharma
5h ago

The point about documentation holds true on the ground. Our forwarder has already seen holds from template mismatches.

In this article
  1. 1. What changed at the port
  2. 2. Rail, warehousing and the middle mile
  3. 3. The gaps that remain
  4. 4. Where the next savings are
  5. 5. Discussion (3)

Trending now

  1. 01Why Australia Is Becoming the Fastest-Growing Market for Indian Consumer Brands
  2. 02Ministry of Science & Technology Notifies Revised Framework for Biotechnology: What Exporters Must Change by Q4 FY27
  3. 03AI Meets Startups: Early Adopters Report 13.5% Productivity Gains
  4. 04Hindalco Industries Commits $6.8 billion to Animal Husbandry Expansion as Global Customers Seek a Second Source
  5. 05FinTech Goes Green: $8.2 billion Pipeline of Clean-Energy Projects Reshapes Cost Curves
Topic
S38 · Manufacturing

Ministry of Commerce & Industry

FranceBrazil

More to read

All headlines →
Trade · Consumer Brands

Why Australia Is Becoming the Fastest-Growing Market for Indian Consumer Brands

7 min read
Policy · Biotechnology

Ministry of Science & Technology Notifies Revised Framework for Biotechnology: What Exporters Must Change by Q4 FY27

4 min read
Sector · Startups

AI Meets Startups: Early Adopters Report 13.5% Productivity Gains

9 min read
Technology · Animal Husbandry

Hindalco Industries Commits $6.8 billion to Animal Husbandry Expansion as Global Customers Seek a Second Source

4 min read
Sector · FinTech

FinTech Goes Green: $8.2 billion Pipeline of Clean-Energy Projects Reshapes Cost Curves

4 min read
Expert · Semiconductors

Analysis: Five Forces Shaping Semiconductors Trade Over the Next Three Years

4 min read
India Global News

The premier institutional platform for global trade intelligence. Empowering 50,000+ professionals with real-time insights, bilateral trade corridors, and predictive analytics across 195 countries.

Stay Ahead of the Curve

Get daily trade intelligence briefings delivered to your inbox. Join 50k+ leaders. Delivered fresh before market opening.

Secure subscription. No spam. Strict data privacy.

Platform

  • Headlines
  • Trending
  • Company News
  • Leader News
  • Expert News
  • Sector News
  • Country News
  • Communities

Intelligence

  • Executive Decision Signals
  • Trade Policy Tracker
  • Bilateral Corridor Matrix
  • Live FDI & Capital Tracker
  • 60 Industrial Sectors
  • Predictive Signals

Events & Expo

  • Expert AMAs & Webinars
  • Executive Roundtables
  • Global Trade Summits
  • B2B Expo Network

Company

  • About iGEN
  • Membership Plans
  • Corporate Directory
  • CareersHiring
  • Contact
  • Advertise

Get In Touch

  • +91 11 4567 8900
  • contact@indiaglobalnews.org
  • New Delhi, India

© 2026 India Global News. All rights reserved.

iGEN is a registered trademark of Global Trade Intelligence Corp.

  • Privacy Policy
  • Terms of Service
  • Cookie Policy
  • Sitemap
System Operational
FeedCountryLeaderSearchProfile
📱Feed
🔥Headlines
📈Trending
🏢Company News
👑Leader News
🎓Expert News
🏭Sector News
🌐Country News
🤝Communities
👤My News
Back to News FeedManufacturingBottleneck Watch: What Is Slowing Manufacturing Shipments Out of Visakhapatnam
TradeS38 · ManufacturingFreeSummary

Bottleneck Watch: What Is Slowing Manufacturing Shipments Out of Visakhapatnam

Faster clearance, new rail links and warehouse automation are rewriting the cost structure of moving Manufacturing goods, but last-mile gaps persist.

MI
Meera IyerVERIFIED
Senior Trade Correspondent, IGEN News
24 Oct 2026, 11:06 IST5 min read4.9K views

Updated 24 Oct 2026, 16:26 IST

Manufacturing: illustrative image for "Bottleneck Watch: What Is Slowing Manufacturing Shipments Out of Visakhapatnam"
Steel, metals and heavy industry: illustrative image for Manufacturing coverage. Photo: Unsplash.
319
3
Sponsored

Trade finance for exporters: invoice discounting in 48 hours (partner content).

Average container dwell time at Visakhapatnam fell to 90 hours in the latest monthly reading, down from 62 hours a year earlier, according to port authority data. For Manufacturing shippers, whose cargo is often time-sensitive and high in value, the improvement has translated into measurable savings on demurrage and inventory carrying costs.

The next phase will be about data. Ports, railways and shippers are working on a shared visibility platform, and a pilot at Visakhapatnam will go live next quarter. If it works, exporters will be able to track a container from factory gate to destination port in a single interface.

Key takeaways

  • Last-mile trucking is the weakest link; goods wait days for a truck after clearing in hours.
  • Modern warehouse occupancy is above 90 percent as rents climb 5.8%.
  • Rail now carries 32.4% of sector export volume on the new corridor.
  • Physical inspection rates dropped to 5.8% under risk-based clearance.
  • Container dwell time at Visakhapatnam fell to 90 hours from 62 a year ago.

What changed at the port

The gains are largely procedural. Pre-arrival processing, risk-based inspection and paperless clearance now cover most consignments, and the share of containers selected for physical examination has fallen to 5.8%. Customs brokers say the biggest change is predictability: clearance windows can now be planned rather than hoped for.

Resilience is now a boardroom topic. After repeated disruptions in global shipping lanes, buyers in France and Brazil have asked suppliers to document contingency routes. Indian exporters with alternative gateways at two or more ports are winning preferred-supplier status in several categories.

By the numbers

Dwell time
44 hrs
-24 hrs YoY
average container dwell
Inspection rate
3.4%
-4 pts
physical inspection rate
Rail share
30.1%
+9 pts
export volume by rail
Logistics saving
6%
cost cut
logistics spend saved

Infosys said it redesigned its network around the new corridor, consolidating three regional warehouses into one automated hub and shifting 8% of its volume to rail. The company estimates a saving of $248 million a year and a reduction in emissions intensity of roughly 5.8%, a point increasingly requested by European customers.

“Resilience is becoming a commercial differentiator, not a cost centre.”

Lakshmi Venkatesan, Agri & Food Trade Reporter

Rail, warehousing and the middle mile

Beyond the port gate, rail is taking a larger role. A dedicated freight corridor connecting Visakhapatnam to inland container depots now carries 32.4% of the sector's export volume, and double-stack services have cut inland transit to under 36 hours for the first time. Rates are competitive with road once total delivered cost is considered.

Average container dwell time at Visakhapatnamhours
Average container dwell time at VisakhapatnamAverage container dwell time at Visakhapatnam: from 35 hours in W1 to 25.2 hours in W8; high 35 in W1, low 25.2 in W8.22.725.828.831.93535W1W2W3W428.5W5W6W725.2W8

Source: IGEN Intelligence analysis of ministry-level press releases data. Illustrative mock data.

Warehousing is evolving in parallel. Grade-A capacity near Visakhapatnam reached 696 thousand square metres this year, with new facilities offering temperature control and bonded storage. Rents have climbed 5.8%, but occupancy at modern sites is above 90 percent, pointing to unmet demand.

Gateway performance comparison
GatewayDwell (hrs)Rail shareInspection rate
Mundra7013%1.9%
Nhava Sheva4822.6%2.1%
Chennai5316.4%2.4%
Kolkata7115.3%6.9%
Visakhapatnam4112.5%3%
Source: IGEN Intelligence database; IGEN estimates. Figures are illustrative mock data.

The gaps that remain

Insurance and finance are adapting. Cargo insurers have begun offering parametric products that pay out automatically when a vessel is delayed beyond a threshold, and banks are experimenting with receivables finance triggered by electronic bills of lading, which could shorten cash cycles by two to three weeks.

Timeline of key events

  1. 6 Sep 2026
    Paperless clearance

    Electronic documents become mandatory for all containerised exports.

  2. 18 Sep 2026
    Rail corridor opens

    Double-stack services begin between Visakhapatnam and the inland depot.

  3. 30 Sep 2026
    Network redesign

    Infosys consolidates three warehouses into one automated hub.

  4. 12 Oct 2026
    Dwell hits low

    Average dwell time drops to 90 hours, a multi-year low.

  5. 24 Oct 2026
    Visibility pilot

    Port, rail and shippers begin a shared tracking pilot.

Technology adoption is uneven. Large shippers have integrated customs, transport and inventory systems and receive alerts on delays in near real time; smaller firms still rely on email and phone calls. Logistics platforms are targeting this gap with subscription tools priced for firms with fewer than 50 shipments a month.

Expert commentary

“Predictability beats speed. A two-day clearance you can plan around is worth more than a one-day clearance you cannot.”

NB
Dr. Neha Bhatia
Technology Policy Fellow, Institute for Digital Trade

“The data is clear on direction and less clear on pace. I would plan for slower and be pleasantly surprised.”

LV
Lakshmi Venkatesan
Agri & Food Trade Reporter, IGEN News

“What matters now is execution. The announcements are in place; the next two quarters will show who can deliver.”

DM
Divya Menon
Partner, Customs & Trade Law, Menon & Partners

Where the next savings are

Policy is encouraging the shift. The national logistics plan sets a target of cutting logistics cost to single digits as a share of output, and the latest budget allocated $2.5 billion to multimodal parks and port connectivity. Industry groups welcome the intent but want faster land-acquisition clearances.

What it means for you

Shippers

Move to paperless clearance and book rail slots in advance; consider a second gateway for contingency.

Logistics providers

Invest in data integration with customs and ports; fragmented last-mile operators should consider consortium models.

Warehouse investors

Demand for bonded and temperature-controlled space near gateways outstrips supply; underwrite at current rents.

Buyers abroad

Ask suppliers for documented contingency routes and track transit via the new visibility tools as they roll out.

Companies and leaders in this story

Infosys Larsen & Toubro Titan Company Bharat Forge Rakesh Bhargava Sudha Raghavan

Frequently asked questions

To 90 hours at Visakhapatnam, from 62 hours a year earlier, driven mainly by paperless clearance and risk-based inspection.

Sources

  1. Ministry-level press releases: Scheme guidelines and cabinet decisions
  2. IGEN Intelligence database: Proprietary tracker of announced projects
  3. Directorate General of Foreign Trade: Export-import policy and public notices
  4. Central Board of Indirect Taxes & Customs: Port-level clearance and dwell data

Mock content for demonstration. Names, figures and quotes are illustrative and not real reporting.

#Manufacturing#SupplyChain#Logistics#Ports#France
MI
Written by

Meera Iyer

Senior Trade Correspondent, IGEN News

Covers bilateral trade corridors, customs reform and export finance. Previously a commodities desk reporter in Mumbai.

Source & Editorial Attribution

Ministry of Commerce & Industry · IGEN Trade Intelligence

This article is curated and summarized by the IGEN editorial desk. All text is verified from official filings and trade bulletins, rendered strictly in plain text for compliance and clarity. Full text and regulatory updates are archived in the national registry.

Daily briefing

Get stories like this in your inbox

One concise email each morning on trade, policy and markets across Manufacturing and 49 other sectors.

Discussion (3)

Sort by: Most recent
Log in to comment
F
Faisal Khan
38m ago

Agree with the expert on diversification. Two gateways saved us last quarter.

T
Tanvi Joshi
2h ago

Good to see concrete figures instead of generalities. The table on destination markets is especially helpful.

A
Ankit Sharma
5h ago

The point about documentation holds true on the ground. Our forwarder has already seen holds from template mismatches.

In this article
  1. 1. What changed at the port
  2. 2. Rail, warehousing and the middle mile
  3. 3. The gaps that remain
  4. 4. Where the next savings are
  5. 5. Discussion (3)

Trending now

  1. 01Why Australia Is Becoming the Fastest-Growing Market for Indian Consumer Brands
  2. 02Ministry of Science & Technology Notifies Revised Framework for Biotechnology: What Exporters Must Change by Q4 FY27
  3. 03AI Meets Startups: Early Adopters Report 13.5% Productivity Gains
  4. 04Hindalco Industries Commits $6.8 billion to Animal Husbandry Expansion as Global Customers Seek a Second Source
  5. 05FinTech Goes Green: $8.2 billion Pipeline of Clean-Energy Projects Reshapes Cost Curves
Topic
S38 · Manufacturing

Ministry of Commerce & Industry

FranceBrazil

More to read

All headlines →
Trade · Consumer Brands

Why Australia Is Becoming the Fastest-Growing Market for Indian Consumer Brands

7 min read
Policy · Biotechnology

Ministry of Science & Technology Notifies Revised Framework for Biotechnology: What Exporters Must Change by Q4 FY27

4 min read
Sector · Startups

AI Meets Startups: Early Adopters Report 13.5% Productivity Gains

9 min read
Technology · Animal Husbandry

Hindalco Industries Commits $6.8 billion to Animal Husbandry Expansion as Global Customers Seek a Second Source

4 min read
Sector · FinTech

FinTech Goes Green: $8.2 billion Pipeline of Clean-Energy Projects Reshapes Cost Curves

4 min read
Expert · Semiconductors

Analysis: Five Forces Shaping Semiconductors Trade Over the Next Three Years

4 min read