India Global News
Visit iGEN World(opens in a new tab)Explore iGEN Expo(opens in a new tab)
AI Plus
India Global News
Explore Upgrade Plan
Sign InRegister
Breaking
India signs $2B semiconductor deal with Netherlands — ASML to set up training center in BangaloreRBI holds rates steady at 6.5% — Export sector welcomes stability amid global uncertaintyIndia-UAE CEPA crosses $100B trade milestone — Services exports surge 40% YoYEuropean Central Bank signals digital euro interoperability with cross-border trade railsNASA commercial space expo unlocks $12B procurement pipeline for private aerospace corridorsIndia signs $2B semiconductor deal with Netherlands — ASML to set up training center in BangaloreRBI holds rates steady at 6.5% — Export sector welcomes stability amid global uncertaintyIndia-UAE CEPA crosses $100B trade milestone — Services exports surge 40% YoYEuropean Central Bank signals digital euro interoperability with cross-border trade railsNASA commercial space expo unlocks $12B procurement pipeline for private aerospace corridors
Back to News FeedNew and Renewable EnergyThe Multimodal Bet: How New and Renewable Energy Firms Are Cutting Logistics Cost by 14.5%
TradeS42 · New and Renewable EnergyFreeSummary

The Multimodal Bet: How New and Renewable Energy Firms Are Cutting Logistics Cost by 14.5%

Shippers that moved early to digital documentation are reporting double-digit reductions in dwell time; laggards are paying for it in demurrage.

KS
Karthik SubramanianVERIFIED
Logistics & Ports Reporter, IGEN News
5 Oct 2026, 18:08 IST10 min read3.2K views

Updated 6 Oct 2026, 23:28 IST

New and Renewable Energy: illustrative image for "The Multimodal Bet: How New and Renewable Energy Firms Are Cutting Logistics Cost by 14.5%"
Renewable energy and power infrastructure: illustrative image for New and Renewable Energy coverage. Photo: Unsplash.
62
3
Sponsored

Trade finance for exporters: invoice discounting in 48 hours (partner content).

Average container dwell time at Tuticorin fell to 48 hours in the latest monthly reading, down from 62 hours a year earlier, according to port authority data. For New and Renewable Energy shippers, whose cargo is often time-sensitive and high in value, the improvement has translated into measurable savings on demurrage and inventory carrying costs.

Warehousing is evolving in parallel. Grade-A capacity near Tuticorin reached 2,018 thousand square metres this year, with new facilities offering temperature control and bonded storage. Rents have climbed 2.5%, but occupancy at modern sites is above 90 percent, pointing to unmet demand.

Key takeaways

  • Modern warehouse occupancy is above 90 percent as rents climb 2.5%.
  • Last-mile trucking is the weakest link; goods wait days for a truck after clearing in hours.
  • Container dwell time at Tuticorin fell to 48 hours from 62 a year ago.
  • Rail now carries 11.7% of sector export volume on the new corridor.
  • A shared visibility platform pilots next quarter at Tuticorin.

What changed at the port

Not every link has kept pace. Last-mile trucking remains fragmented, with small operators accounting for most capacity and little data sharing. Several exporters reported that goods cleared in 24 hours then waited three days for a truck, eroding much of the benefit achieved upstream.

Resilience is now a boardroom topic. After repeated disruptions in global shipping lanes, buyers in Saudi Arabia and United Kingdom have asked suppliers to document contingency routes. Indian exporters with alternative gateways at two or more ports are winning preferred-supplier status in several categories.

By the numbers

Dwell time
35 hrs
-24 hrs YoY
average container dwell
Inspection rate
2.8%
-4 pts
physical inspection rate
Rail share
14.8%
+9 pts
export volume by rail
Logistics saving
8.4%
cost cut
logistics spend saved

The next phase will be about data. Ports, railways and shippers are working on a shared visibility platform, and a pilot at Tuticorin will go live next quarter. If it works, exporters will be able to track a container from factory gate to destination port in a single interface.

“Resilience is becoming a commercial differentiator, not a cost centre.”

Rajiv Khanna, Former Commerce Secretary

Rail, warehousing and the middle mile

Infosys said it redesigned its network around the new corridor, consolidating three regional warehouses into one automated hub and shifting 14.5% of its volume to rail. The company estimates a saving of $161 million a year and a reduction in emissions intensity of roughly 2.5%, a point increasingly requested by European customers.

Average container dwell time at Tuticorinhours
Average container dwell time at TuticorinAverage container dwell time at Tuticorin: from 28 hours in W1 to 20.8 hours in W8; high 28 in W1, low 20.8 in W8.18.72123.425.72828W1W2W3W424.7W5W6W720.8W8

Source: IGEN Intelligence analysis of port authority statistics data. Illustrative mock data.

Technology adoption is uneven. Large shippers have integrated customs, transport and inventory systems and receive alerts on delays in near real time; smaller firms still rely on email and phone calls. Logistics platforms are targeting this gap with subscription tools priced for firms with fewer than 50 shipments a month.

Gateway performance comparison
GatewayDwell (hrs)Rail shareInspection rate
Mundra355.8%1.7%
Nhava Sheva6216.1%3.4%
Chennai3219.4%6.8%
Kolkata3425.9%6.1%
Visakhapatnam5020.5%1.7%
Source: Industry association surveys; IGEN estimates. Figures are illustrative mock data.

The gaps that remain

The gains are largely procedural. Pre-arrival processing, risk-based inspection and paperless clearance now cover most consignments, and the share of containers selected for physical examination has fallen to 2.5%. Customs brokers say the biggest change is predictability: clearance windows can now be planned rather than hoped for.

Timeline of key events

  1. 7 Sep 2026
    Paperless clearance

    Electronic documents become mandatory for all containerised exports.

  2. 14 Sep 2026
    Rail corridor opens

    Double-stack services begin between Tuticorin and the inland depot.

  3. 21 Sep 2026
    Network redesign

    Infosys consolidates three warehouses into one automated hub.

  4. 28 Sep 2026
    Dwell hits low

    Average dwell time drops to 48 hours, a multi-year low.

  5. 5 Oct 2026
    Visibility pilot

    Port, rail and shippers begin a shared tracking pilot.

Beyond the port gate, rail is taking a larger role. A dedicated freight corridor connecting Tuticorin to inland container depots now carries 11.7% of the sector's export volume, and double-stack services have cut inland transit to under 36 hours for the first time. Rates are competitive with road once total delivered cost is considered.

Expert commentary

“The port is no longer the problem. The problem is everything that happens in the 200 kilometres after the gate.”

HS
Harpreet Sandhu
Chief Economist, Northbridge Capital

“The risk I would watch is a sudden policy move in Saudi Arabia. Everything else can be hedged or absorbed.”

RK
Rajiv Khanna
Former Commerce Secretary, Independent Advisor

“Buyers are paying a premium for certainty. Suppliers who can document, deliver and communicate will capture it.”

AP
Arvind Pillai
Chairman, Southern Ports Association

Where the next savings are

Insurance and finance are adapting. Cargo insurers have begun offering parametric products that pay out automatically when a vessel is delayed beyond a threshold, and banks are experimenting with receivables finance triggered by electronic bills of lading, which could shorten cash cycles by two to three weeks.

What it means for you

Shippers

Move to paperless clearance and book rail slots in advance; consider a second gateway for contingency.

Logistics providers

Invest in data integration with customs and ports; fragmented last-mile operators should consider consortium models.

Warehouse investors

Demand for bonded and temperature-controlled space near gateways outstrips supply; underwrite at current rents.

Buyers abroad

Ask suppliers for documented contingency routes and track transit via the new visibility tools as they roll out.

Companies and leaders in this story

Infosys Mahindra Group Wipro Ultratech Cement Dev Malik Rakesh Bhargava

Frequently asked questions

To 48 hours at Tuticorin, from 62 hours a year earlier, driven mainly by paperless clearance and risk-based inspection.

Sources

  1. Port authority statistics: Container volumes, dwell times and berth productivity
  2. Industry association surveys: Member-level compliance and sentiment data
  3. Ministry-level press releases: Scheme guidelines and cabinet decisions
  4. Reserve Bank of India: Exchange-rate and trade-credit bulletins

Mock content for demonstration. Names, figures and quotes are illustrative and not real reporting.

#NewandRenewableEnergy#SupplyChain#Logistics#Ports#SaudiArabia
KS
Written by

Karthik Subramanian

Logistics & Ports Reporter, IGEN News

Follows container volumes, port efficiency and multimodal corridors from Kandla to Kolkata.

Source & Editorial Attribution

Ministry of New & Renewable Energy · IGEN Trade Intelligence

This article is curated and summarized by the IGEN editorial desk. All text is verified from official filings and trade bulletins, rendered strictly in plain text for compliance and clarity. Full text and regulatory updates are archived in the national registry.

Daily briefing

Get stories like this in your inbox

One concise email each morning on trade, policy and markets across New and Renewable Energy and 49 other sectors.

Discussion (3)

Sort by: Most recent
Log in to comment
T
Tanvi Joshi
38m ago

Good to see concrete figures instead of generalities. The table on destination markets is especially helpful.

S
Smita Verma
2h ago

Useful numbers. Would love to see the same breakdown for smaller units, since they carry most of the compliance burden.

F
Faisal Khan
5h ago

Agree with the expert on diversification. Two gateways saved us last quarter.

In this article
  1. 1. What changed at the port
  2. 2. Rail, warehousing and the middle mile
  3. 3. The gaps that remain
  4. 4. Where the next savings are
  5. 5. Discussion (3)

Trending now

  1. 01Maruti Suzuki Commits $8.8 billion to Atomic Energy Expansion as Global Customers Seek a Second Source
  2. 02AI Meets Startups: Early Adopters Report 13.5% Productivity Gains
  3. 03Compliance Window Opens for Mines Units as Ministry of Mines Tightens Standards
  4. 04New Electronics Incentive Scheme Clears Cabinet With $9.5 billion Outlay
  5. 05India and Brazil: Bilateral Trade Reaches $2 billion as Talks Enter Final Stretch
Topic
S42 · New and Renewable Energy

Ministry of New & Renewable Energy

Saudi ArabiaUnited Kingdom

More to read

All headlines →
Sector · Atomic Energy

Maruti Suzuki Commits $8.8 billion to Atomic Energy Expansion as Global Customers Seek a Second Source

4 min read
Sector · Startups

AI Meets Startups: Early Adopters Report 13.5% Productivity Gains

9 min read
Policy · Mines

Compliance Window Opens for Mines Units as Ministry of Mines Tightens Standards

6 min read
Policy · Electronics

New Electronics Incentive Scheme Clears Cabinet With $9.5 billion Outlay

9 min read
Country · Animal Husbandry

India and Brazil: Bilateral Trade Reaches $2 billion as Talks Enter Final Stretch

6 min read
Technology · Startups

Sun Pharma Commits $3.2 billion to Startups Expansion as Global Customers Seek a Second Source

8 min read
India Global News

The premier institutional platform for global trade intelligence. Empowering 50,000+ professionals with real-time insights, bilateral trade corridors, and predictive analytics across 195 countries.

Stay Ahead of the Curve

Get daily trade intelligence briefings delivered to your inbox. Join 50k+ leaders. Delivered fresh before market opening.

Secure subscription. No spam. Strict data privacy.

Platform

  • Headlines
  • Trending
  • Company News
  • Leader News
  • Expert News
  • Sector News
  • Country News
  • Communities

Intelligence

  • Executive Decision Signals
  • Trade Policy Tracker
  • Bilateral Corridor Matrix
  • Live FDI & Capital Tracker
  • 60 Industrial Sectors
  • Predictive Signals

Events & Expo

  • Expert AMAs & Webinars
  • Executive Roundtables
  • Global Trade Summits
  • B2B Expo Network

Company

  • About iGEN
  • Membership Plans
  • Corporate Directory
  • CareersHiring
  • Contact
  • Advertise

Get In Touch

  • +91 11 4567 8900
  • contact@indiaglobalnews.org
  • New Delhi, India

© 2026 India Global News. All rights reserved.

iGEN is a registered trademark of Global Trade Intelligence Corp.

  • Privacy Policy
  • Terms of Service
  • Cookie Policy
  • Sitemap
System Operational
FeedCountryLeaderSearchProfile
📱Feed
🔥Headlines
📈Trending
🏢Company News
👑Leader News
🎓Expert News
🏭Sector News
🌐Country News
🤝Communities
👤My News
Back to News FeedNew and Renewable EnergyThe Multimodal Bet: How New and Renewable Energy Firms Are Cutting Logistics Cost by 14.5%
TradeS42 · New and Renewable EnergyFreeSummary

The Multimodal Bet: How New and Renewable Energy Firms Are Cutting Logistics Cost by 14.5%

Shippers that moved early to digital documentation are reporting double-digit reductions in dwell time; laggards are paying for it in demurrage.

KS
Karthik SubramanianVERIFIED
Logistics & Ports Reporter, IGEN News
5 Oct 2026, 18:08 IST10 min read3.2K views

Updated 6 Oct 2026, 23:28 IST

New and Renewable Energy: illustrative image for "The Multimodal Bet: How New and Renewable Energy Firms Are Cutting Logistics Cost by 14.5%"
Renewable energy and power infrastructure: illustrative image for New and Renewable Energy coverage. Photo: Unsplash.
62
3
Sponsored

Trade finance for exporters: invoice discounting in 48 hours (partner content).

Average container dwell time at Tuticorin fell to 48 hours in the latest monthly reading, down from 62 hours a year earlier, according to port authority data. For New and Renewable Energy shippers, whose cargo is often time-sensitive and high in value, the improvement has translated into measurable savings on demurrage and inventory carrying costs.

Warehousing is evolving in parallel. Grade-A capacity near Tuticorin reached 2,018 thousand square metres this year, with new facilities offering temperature control and bonded storage. Rents have climbed 2.5%, but occupancy at modern sites is above 90 percent, pointing to unmet demand.

Key takeaways

  • Modern warehouse occupancy is above 90 percent as rents climb 2.5%.
  • Last-mile trucking is the weakest link; goods wait days for a truck after clearing in hours.
  • Container dwell time at Tuticorin fell to 48 hours from 62 a year ago.
  • Rail now carries 11.7% of sector export volume on the new corridor.
  • A shared visibility platform pilots next quarter at Tuticorin.

What changed at the port

Not every link has kept pace. Last-mile trucking remains fragmented, with small operators accounting for most capacity and little data sharing. Several exporters reported that goods cleared in 24 hours then waited three days for a truck, eroding much of the benefit achieved upstream.

Resilience is now a boardroom topic. After repeated disruptions in global shipping lanes, buyers in Saudi Arabia and United Kingdom have asked suppliers to document contingency routes. Indian exporters with alternative gateways at two or more ports are winning preferred-supplier status in several categories.

By the numbers

Dwell time
35 hrs
-24 hrs YoY
average container dwell
Inspection rate
2.8%
-4 pts
physical inspection rate
Rail share
14.8%
+9 pts
export volume by rail
Logistics saving
8.4%
cost cut
logistics spend saved

The next phase will be about data. Ports, railways and shippers are working on a shared visibility platform, and a pilot at Tuticorin will go live next quarter. If it works, exporters will be able to track a container from factory gate to destination port in a single interface.

“Resilience is becoming a commercial differentiator, not a cost centre.”

Rajiv Khanna, Former Commerce Secretary

Rail, warehousing and the middle mile

Infosys said it redesigned its network around the new corridor, consolidating three regional warehouses into one automated hub and shifting 14.5% of its volume to rail. The company estimates a saving of $161 million a year and a reduction in emissions intensity of roughly 2.5%, a point increasingly requested by European customers.

Average container dwell time at Tuticorinhours
Average container dwell time at TuticorinAverage container dwell time at Tuticorin: from 28 hours in W1 to 20.8 hours in W8; high 28 in W1, low 20.8 in W8.18.72123.425.72828W1W2W3W424.7W5W6W720.8W8

Source: IGEN Intelligence analysis of port authority statistics data. Illustrative mock data.

Technology adoption is uneven. Large shippers have integrated customs, transport and inventory systems and receive alerts on delays in near real time; smaller firms still rely on email and phone calls. Logistics platforms are targeting this gap with subscription tools priced for firms with fewer than 50 shipments a month.

Gateway performance comparison
GatewayDwell (hrs)Rail shareInspection rate
Mundra355.8%1.7%
Nhava Sheva6216.1%3.4%
Chennai3219.4%6.8%
Kolkata3425.9%6.1%
Visakhapatnam5020.5%1.7%
Source: Industry association surveys; IGEN estimates. Figures are illustrative mock data.

The gaps that remain

The gains are largely procedural. Pre-arrival processing, risk-based inspection and paperless clearance now cover most consignments, and the share of containers selected for physical examination has fallen to 2.5%. Customs brokers say the biggest change is predictability: clearance windows can now be planned rather than hoped for.

Timeline of key events

  1. 7 Sep 2026
    Paperless clearance

    Electronic documents become mandatory for all containerised exports.

  2. 14 Sep 2026
    Rail corridor opens

    Double-stack services begin between Tuticorin and the inland depot.

  3. 21 Sep 2026
    Network redesign

    Infosys consolidates three warehouses into one automated hub.

  4. 28 Sep 2026
    Dwell hits low

    Average dwell time drops to 48 hours, a multi-year low.

  5. 5 Oct 2026
    Visibility pilot

    Port, rail and shippers begin a shared tracking pilot.

Beyond the port gate, rail is taking a larger role. A dedicated freight corridor connecting Tuticorin to inland container depots now carries 11.7% of the sector's export volume, and double-stack services have cut inland transit to under 36 hours for the first time. Rates are competitive with road once total delivered cost is considered.

Expert commentary

“The port is no longer the problem. The problem is everything that happens in the 200 kilometres after the gate.”

HS
Harpreet Sandhu
Chief Economist, Northbridge Capital

“The risk I would watch is a sudden policy move in Saudi Arabia. Everything else can be hedged or absorbed.”

RK
Rajiv Khanna
Former Commerce Secretary, Independent Advisor

“Buyers are paying a premium for certainty. Suppliers who can document, deliver and communicate will capture it.”

AP
Arvind Pillai
Chairman, Southern Ports Association

Where the next savings are

Insurance and finance are adapting. Cargo insurers have begun offering parametric products that pay out automatically when a vessel is delayed beyond a threshold, and banks are experimenting with receivables finance triggered by electronic bills of lading, which could shorten cash cycles by two to three weeks.

What it means for you

Shippers

Move to paperless clearance and book rail slots in advance; consider a second gateway for contingency.

Logistics providers

Invest in data integration with customs and ports; fragmented last-mile operators should consider consortium models.

Warehouse investors

Demand for bonded and temperature-controlled space near gateways outstrips supply; underwrite at current rents.

Buyers abroad

Ask suppliers for documented contingency routes and track transit via the new visibility tools as they roll out.

Companies and leaders in this story

Infosys Mahindra Group Wipro Ultratech Cement Dev Malik Rakesh Bhargava

Frequently asked questions

To 48 hours at Tuticorin, from 62 hours a year earlier, driven mainly by paperless clearance and risk-based inspection.

Sources

  1. Port authority statistics: Container volumes, dwell times and berth productivity
  2. Industry association surveys: Member-level compliance and sentiment data
  3. Ministry-level press releases: Scheme guidelines and cabinet decisions
  4. Reserve Bank of India: Exchange-rate and trade-credit bulletins

Mock content for demonstration. Names, figures and quotes are illustrative and not real reporting.

#NewandRenewableEnergy#SupplyChain#Logistics#Ports#SaudiArabia
KS
Written by

Karthik Subramanian

Logistics & Ports Reporter, IGEN News

Follows container volumes, port efficiency and multimodal corridors from Kandla to Kolkata.

Source & Editorial Attribution

Ministry of New & Renewable Energy · IGEN Trade Intelligence

This article is curated and summarized by the IGEN editorial desk. All text is verified from official filings and trade bulletins, rendered strictly in plain text for compliance and clarity. Full text and regulatory updates are archived in the national registry.

Daily briefing

Get stories like this in your inbox

One concise email each morning on trade, policy and markets across New and Renewable Energy and 49 other sectors.

Discussion (3)

Sort by: Most recent
Log in to comment
T
Tanvi Joshi
38m ago

Good to see concrete figures instead of generalities. The table on destination markets is especially helpful.

S
Smita Verma
2h ago

Useful numbers. Would love to see the same breakdown for smaller units, since they carry most of the compliance burden.

F
Faisal Khan
5h ago

Agree with the expert on diversification. Two gateways saved us last quarter.

In this article
  1. 1. What changed at the port
  2. 2. Rail, warehousing and the middle mile
  3. 3. The gaps that remain
  4. 4. Where the next savings are
  5. 5. Discussion (3)

Trending now

  1. 01Maruti Suzuki Commits $8.8 billion to Atomic Energy Expansion as Global Customers Seek a Second Source
  2. 02AI Meets Startups: Early Adopters Report 13.5% Productivity Gains
  3. 03Compliance Window Opens for Mines Units as Ministry of Mines Tightens Standards
  4. 04New Electronics Incentive Scheme Clears Cabinet With $9.5 billion Outlay
  5. 05India and Brazil: Bilateral Trade Reaches $2 billion as Talks Enter Final Stretch
Topic
S42 · New and Renewable Energy

Ministry of New & Renewable Energy

Saudi ArabiaUnited Kingdom

More to read

All headlines →
Sector · Atomic Energy

Maruti Suzuki Commits $8.8 billion to Atomic Energy Expansion as Global Customers Seek a Second Source

4 min read
Sector · Startups

AI Meets Startups: Early Adopters Report 13.5% Productivity Gains

9 min read
Policy · Mines

Compliance Window Opens for Mines Units as Ministry of Mines Tightens Standards

6 min read
Policy · Electronics

New Electronics Incentive Scheme Clears Cabinet With $9.5 billion Outlay

9 min read
Country · Animal Husbandry

India and Brazil: Bilateral Trade Reaches $2 billion as Talks Enter Final Stretch

6 min read
Technology · Startups

Sun Pharma Commits $3.2 billion to Startups Expansion as Global Customers Seek a Second Source

8 min read