India Global News
Visit iGEN World(opens in a new tab)Explore iGEN Expo(opens in a new tab)
AI Plus
India Global News
Explore Upgrade Plan
Sign InRegister
Breaking
India signs $2B semiconductor deal with Netherlands — ASML to set up training center in BangaloreRBI holds rates steady at 6.5% — Export sector welcomes stability amid global uncertaintyIndia-UAE CEPA crosses $100B trade milestone — Services exports surge 40% YoYEuropean Central Bank signals digital euro interoperability with cross-border trade railsNASA commercial space expo unlocks $12B procurement pipeline for private aerospace corridorsIndia signs $2B semiconductor deal with Netherlands — ASML to set up training center in BangaloreRBI holds rates steady at 6.5% — Export sector welcomes stability amid global uncertaintyIndia-UAE CEPA crosses $100B trade milestone — Services exports surge 40% YoYEuropean Central Bank signals digital euro interoperability with cross-border trade railsNASA commercial space expo unlocks $12B procurement pipeline for private aerospace corridors
Back to News FeedInfrastructureThe Multimodal Bet: How Infrastructure Firms Are Cutting Logistics Cost by 11.3%
TradeS36 · Infrastructure & ConstructionFreeSummary

The Multimodal Bet: How Infrastructure Firms Are Cutting Logistics Cost by 11.3%

Shippers that moved early to digital documentation are reporting double-digit reductions in dwell time; laggards are paying for it in demurrage.

MI
Meera IyerVERIFIED
Senior Trade Correspondent, IGEN News
9 Oct 2026, 15:14 IST7 min read9.4K views

Updated 9 Oct 2026, 20:34 IST

Infrastructure & Construction: illustrative image for "The Multimodal Bet: How Infrastructure Firms Are Cutting Logistics Cost by 11.3%"
Railways and infrastructure: illustrative image for Infrastructure coverage. Photo: Unsplash.
454
3
Sponsored

Trade finance for exporters: invoice discounting in 48 hours (partner content).

Average container dwell time at Cochin fell to 60 hours in the latest monthly reading, down from 62 hours a year earlier, according to port authority data. For Infrastructure shippers, whose cargo is often time-sensitive and high in value, the improvement has translated into measurable savings on demurrage and inventory carrying costs.

The next phase will be about data. Ports, railways and shippers are working on a shared visibility platform, and a pilot at Cochin will go live next quarter. If it works, exporters will be able to track a container from factory gate to destination port in a single interface.

Key takeaways

  • Rail now carries 33.8% of sector export volume on the new corridor.
  • A shared visibility platform pilots next quarter at Cochin.
  • Physical inspection rates dropped to 11.6% under risk-based clearance.
  • Last-mile trucking is the weakest link; goods wait days for a truck after clearing in hours.
  • Container dwell time at Cochin fell to 60 hours from 62 a year ago.

What changed at the port

The gains are largely procedural. Pre-arrival processing, risk-based inspection and paperless clearance now cover most consignments, and the share of containers selected for physical examination has fallen to 11.6%. Customs brokers say the biggest change is predictability: clearance windows can now be planned rather than hoped for.

Adani Ports said it redesigned its network around the new corridor, consolidating three regional warehouses into one automated hub and shifting 11.3% of its volume to rail. The company estimates a saving of $454 million a year and a reduction in emissions intensity of roughly 11.6%, a point increasingly requested by European customers.

By the numbers

Dwell time
46 hrs
-24 hrs YoY
average container dwell
Inspection rate
5.5%
-4 pts
physical inspection rate
Rail share
30%
+9 pts
export volume by rail
Logistics saving
9.2%
cost cut
logistics spend saved

Resilience is now a boardroom topic. After repeated disruptions in global shipping lanes, buyers in United Kingdom and South Korea have asked suppliers to document contingency routes. Indian exporters with alternative gateways at two or more ports are winning preferred-supplier status in several categories.

“Predictability beats speed. A two-day clearance you can plan around is worth more than a one-day clearance you cannot.”

Harpreet Sandhu, Chief Economist

Rail, warehousing and the middle mile

Technology adoption is uneven. Large shippers have integrated customs, transport and inventory systems and receive alerts on delays in near real time; smaller firms still rely on email and phone calls. Logistics platforms are targeting this gap with subscription tools priced for firms with fewer than 50 shipments a month.

Average container dwell time at Cochinhours
Average container dwell time at CochinAverage container dwell time at Cochin: from 10.2 hours in W1 to 6.6 hours in W8; high 10.2 in W1, low 6.6 in W8.5.978.19.110.210.2W1W2W3W48.2W5W6W76.6W8

Source: IGEN Intelligence analysis of ministry of commerce & industry data. Illustrative mock data.

Warehousing is evolving in parallel. Grade-A capacity near Cochin reached 586 thousand square metres this year, with new facilities offering temperature control and bonded storage. Rents have climbed 11.6%, but occupancy at modern sites is above 90 percent, pointing to unmet demand.

Gateway performance comparison
GatewayDwell (hrs)Rail shareInspection rate
Mundra394.9%2%
Nhava Sheva6118.3%4.2%
Chennai6915%2.2%
Kolkata489.9%3.6%
Visakhapatnam3018.4%6.6%
Source: Company filings and earnings calls; IGEN estimates. Figures are illustrative mock data.

The gaps that remain

Not every link has kept pace. Last-mile trucking remains fragmented, with small operators accounting for most capacity and little data sharing. Several exporters reported that goods cleared in 24 hours then waited three days for a truck, eroding much of the benefit achieved upstream.

Timeline of key events

  1. 11 Sep 2026
    Paperless clearance

    Electronic documents become mandatory for all containerised exports.

  2. 18 Sep 2026
    Rail corridor opens

    Double-stack services begin between Cochin and the inland depot.

  3. 25 Sep 2026
    Network redesign

    Adani Ports consolidates three warehouses into one automated hub.

  4. 2 Oct 2026
    Dwell hits low

    Average dwell time drops to 60 hours, a multi-year low.

  5. 9 Oct 2026
    Visibility pilot

    Port, rail and shippers begin a shared tracking pilot.

Beyond the port gate, rail is taking a larger role. A dedicated freight corridor connecting Cochin to inland container depots now carries 33.8% of the sector's export volume, and double-stack services have cut inland transit to under 36 hours for the first time. Rates are competitive with road once total delivered cost is considered.

Expert commentary

“Resilience is becoming a commercial differentiator, not a cost centre.”

SG
Sunita Ghosh
Head of Trade Policy, Federation of Exporters

“The risk I would watch is a sudden policy move in United Kingdom. Everything else can be hedged or absorbed.”

HS
Harpreet Sandhu
Chief Economist, Northbridge Capital

“Firms that treat this as a compliance exercise will keep up. Firms that treat it as a design problem will pull ahead.”

FS
Dr. Farah Siddiqui
Economist, Trade & Development, Centre for Trade Studies

Where the next savings are

Policy is encouraging the shift. The national logistics plan sets a target of cutting logistics cost to single digits as a share of output, and the latest budget allocated $1.7 billion to multimodal parks and port connectivity. Industry groups welcome the intent but want faster land-acquisition clearances.

What it means for you

Shippers

Move to paperless clearance and book rail slots in advance; consider a second gateway for contingency.

Logistics providers

Invest in data integration with customs and ports; fragmented last-mile operators should consider consortium models.

Warehouse investors

Demand for bonded and temperature-controlled space near gateways outstrips supply; underwrite at current rents.

Buyers abroad

Ask suppliers for documented contingency routes and track transit via the new visibility tools as they roll out.

Companies and leaders in this story

Adani Ports Sun Pharma JSW Steel Tata Electronics Anita Deshmukh Amit Chandra

Frequently asked questions

To 60 hours at Cochin, from 62 hours a year earlier, driven mainly by paperless clearance and risk-based inspection.

Sources

  1. Ministry of Commerce & Industry: Monthly trade statistics and notifications
  2. Company filings and earnings calls: Disclosures on order books and capex
  3. Ministry-level press releases: Scheme guidelines and cabinet decisions
  4. Central Board of Indirect Taxes & Customs: Port-level clearance and dwell data

Mock content for demonstration. Names, figures and quotes are illustrative and not real reporting.

#Infrastructure#SupplyChain#Logistics#Ports#UnitedKingdom
MI
Written by

Meera Iyer

Senior Trade Correspondent, IGEN News

Covers bilateral trade corridors, customs reform and export finance. Previously a commodities desk reporter in Mumbai.

Source & Editorial Attribution

Ministry of Housing & Urban Affairs · IGEN Trade Intelligence

This article is curated and summarized by the IGEN editorial desk. All text is verified from official filings and trade bulletins, rendered strictly in plain text for compliance and clarity. Full text and regulatory updates are archived in the national registry.

Daily briefing

Get stories like this in your inbox

One concise email each morning on trade, policy and markets across Infrastructure and 49 other sectors.

Discussion (3)

Sort by: Most recent
Log in to comment
T
Tanvi Joshi
38m ago

Good to see concrete figures instead of generalities. The table on destination markets is especially helpful.

D
Deepa Nair
2h ago

Any word on how this plays out for services exporters? Would be a good follow-up.

A
Ankit Sharma
5h ago

The point about documentation holds true on the ground. Our forwarder has already seen holds from template mismatches.

In this article
  1. 1. What changed at the port
  2. 2. Rail, warehousing and the middle mile
  3. 3. The gaps that remain
  4. 4. Where the next savings are
  5. 5. Discussion (3)

Trending now

  1. 01Inside the Power Policy Reset: Winners, Losers and the 30-Day Countdown
  2. 02Analysis: Five Forces Shaping Semiconductors Trade Over the Next Three Years
  3. 03Rewiring the Banking Supply Chain: $3.4 billion of Capacity Moves Closer to the Customer
  4. 04Why Netherlands Is Becoming the Fastest-Growing Market for Indian Aerospace
  5. 05Nikhil Kamath on Building a Global Health and Family Welfare Business From India: "Patience Is a Strategy"
Topic
S36 · Infrastructure & Construction

Ministry of Housing & Urban Affairs

United KingdomSouth Korea

More to read

All headlines →
Policy · Power

Inside the Power Policy Reset: Winners, Losers and the 30-Day Countdown

8 min read
Expert · Semiconductors

Analysis: Five Forces Shaping Semiconductors Trade Over the Next Three Years

4 min read
Trade · Banking

Rewiring the Banking Supply Chain: $3.4 billion of Capacity Moves Closer to the Customer

7 min read
Country · Aerospace

Why Netherlands Is Becoming the Fastest-Growing Market for Indian Aerospace

5 min read
Leader · Health and Family Welfare

Nikhil Kamath on Building a Global Health and Family Welfare Business From India: "Patience Is a Strategy"

4 min read
Expert · Biotechnology

The Long Read: Biotechnology After the Tariff Reset

4 min read
India Global News

The premier institutional platform for global trade intelligence. Empowering 50,000+ professionals with real-time insights, bilateral trade corridors, and predictive analytics across 195 countries.

Stay Ahead of the Curve

Get daily trade intelligence briefings delivered to your inbox. Join 50k+ leaders. Delivered fresh before market opening.

Secure subscription. No spam. Strict data privacy.

Platform

  • Headlines
  • Trending
  • Company News
  • Leader News
  • Expert News
  • Sector News
  • Country News
  • Communities

Intelligence

  • Executive Decision Signals
  • Trade Policy Tracker
  • Bilateral Corridor Matrix
  • Live FDI & Capital Tracker
  • 60 Industrial Sectors
  • Predictive Signals

Events & Expo

  • Expert AMAs & Webinars
  • Executive Roundtables
  • Global Trade Summits
  • B2B Expo Network

Company

  • About iGEN
  • Membership Plans
  • Corporate Directory
  • CareersHiring
  • Contact
  • Advertise

Get In Touch

  • +91 11 4567 8900
  • contact@indiaglobalnews.org
  • New Delhi, India

© 2026 India Global News. All rights reserved.

iGEN is a registered trademark of Global Trade Intelligence Corp.

  • Privacy Policy
  • Terms of Service
  • Cookie Policy
  • Sitemap
System Operational
FeedCountryLeaderSearchProfile
📱Feed
🔥Headlines
📈Trending
🏢Company News
👑Leader News
🎓Expert News
🏭Sector News
🌐Country News
🤝Communities
👤My News
Back to News FeedInfrastructureThe Multimodal Bet: How Infrastructure Firms Are Cutting Logistics Cost by 11.3%
TradeS36 · Infrastructure & ConstructionFreeSummary

The Multimodal Bet: How Infrastructure Firms Are Cutting Logistics Cost by 11.3%

Shippers that moved early to digital documentation are reporting double-digit reductions in dwell time; laggards are paying for it in demurrage.

MI
Meera IyerVERIFIED
Senior Trade Correspondent, IGEN News
9 Oct 2026, 15:14 IST7 min read9.4K views

Updated 9 Oct 2026, 20:34 IST

Infrastructure & Construction: illustrative image for "The Multimodal Bet: How Infrastructure Firms Are Cutting Logistics Cost by 11.3%"
Railways and infrastructure: illustrative image for Infrastructure coverage. Photo: Unsplash.
454
3
Sponsored

Trade finance for exporters: invoice discounting in 48 hours (partner content).

Average container dwell time at Cochin fell to 60 hours in the latest monthly reading, down from 62 hours a year earlier, according to port authority data. For Infrastructure shippers, whose cargo is often time-sensitive and high in value, the improvement has translated into measurable savings on demurrage and inventory carrying costs.

The next phase will be about data. Ports, railways and shippers are working on a shared visibility platform, and a pilot at Cochin will go live next quarter. If it works, exporters will be able to track a container from factory gate to destination port in a single interface.

Key takeaways

  • Rail now carries 33.8% of sector export volume on the new corridor.
  • A shared visibility platform pilots next quarter at Cochin.
  • Physical inspection rates dropped to 11.6% under risk-based clearance.
  • Last-mile trucking is the weakest link; goods wait days for a truck after clearing in hours.
  • Container dwell time at Cochin fell to 60 hours from 62 a year ago.

What changed at the port

The gains are largely procedural. Pre-arrival processing, risk-based inspection and paperless clearance now cover most consignments, and the share of containers selected for physical examination has fallen to 11.6%. Customs brokers say the biggest change is predictability: clearance windows can now be planned rather than hoped for.

Adani Ports said it redesigned its network around the new corridor, consolidating three regional warehouses into one automated hub and shifting 11.3% of its volume to rail. The company estimates a saving of $454 million a year and a reduction in emissions intensity of roughly 11.6%, a point increasingly requested by European customers.

By the numbers

Dwell time
46 hrs
-24 hrs YoY
average container dwell
Inspection rate
5.5%
-4 pts
physical inspection rate
Rail share
30%
+9 pts
export volume by rail
Logistics saving
9.2%
cost cut
logistics spend saved

Resilience is now a boardroom topic. After repeated disruptions in global shipping lanes, buyers in United Kingdom and South Korea have asked suppliers to document contingency routes. Indian exporters with alternative gateways at two or more ports are winning preferred-supplier status in several categories.

“Predictability beats speed. A two-day clearance you can plan around is worth more than a one-day clearance you cannot.”

Harpreet Sandhu, Chief Economist

Rail, warehousing and the middle mile

Technology adoption is uneven. Large shippers have integrated customs, transport and inventory systems and receive alerts on delays in near real time; smaller firms still rely on email and phone calls. Logistics platforms are targeting this gap with subscription tools priced for firms with fewer than 50 shipments a month.

Average container dwell time at Cochinhours
Average container dwell time at CochinAverage container dwell time at Cochin: from 10.2 hours in W1 to 6.6 hours in W8; high 10.2 in W1, low 6.6 in W8.5.978.19.110.210.2W1W2W3W48.2W5W6W76.6W8

Source: IGEN Intelligence analysis of ministry of commerce & industry data. Illustrative mock data.

Warehousing is evolving in parallel. Grade-A capacity near Cochin reached 586 thousand square metres this year, with new facilities offering temperature control and bonded storage. Rents have climbed 11.6%, but occupancy at modern sites is above 90 percent, pointing to unmet demand.

Gateway performance comparison
GatewayDwell (hrs)Rail shareInspection rate
Mundra394.9%2%
Nhava Sheva6118.3%4.2%
Chennai6915%2.2%
Kolkata489.9%3.6%
Visakhapatnam3018.4%6.6%
Source: Company filings and earnings calls; IGEN estimates. Figures are illustrative mock data.

The gaps that remain

Not every link has kept pace. Last-mile trucking remains fragmented, with small operators accounting for most capacity and little data sharing. Several exporters reported that goods cleared in 24 hours then waited three days for a truck, eroding much of the benefit achieved upstream.

Timeline of key events

  1. 11 Sep 2026
    Paperless clearance

    Electronic documents become mandatory for all containerised exports.

  2. 18 Sep 2026
    Rail corridor opens

    Double-stack services begin between Cochin and the inland depot.

  3. 25 Sep 2026
    Network redesign

    Adani Ports consolidates three warehouses into one automated hub.

  4. 2 Oct 2026
    Dwell hits low

    Average dwell time drops to 60 hours, a multi-year low.

  5. 9 Oct 2026
    Visibility pilot

    Port, rail and shippers begin a shared tracking pilot.

Beyond the port gate, rail is taking a larger role. A dedicated freight corridor connecting Cochin to inland container depots now carries 33.8% of the sector's export volume, and double-stack services have cut inland transit to under 36 hours for the first time. Rates are competitive with road once total delivered cost is considered.

Expert commentary

“Resilience is becoming a commercial differentiator, not a cost centre.”

SG
Sunita Ghosh
Head of Trade Policy, Federation of Exporters

“The risk I would watch is a sudden policy move in United Kingdom. Everything else can be hedged or absorbed.”

HS
Harpreet Sandhu
Chief Economist, Northbridge Capital

“Firms that treat this as a compliance exercise will keep up. Firms that treat it as a design problem will pull ahead.”

FS
Dr. Farah Siddiqui
Economist, Trade & Development, Centre for Trade Studies

Where the next savings are

Policy is encouraging the shift. The national logistics plan sets a target of cutting logistics cost to single digits as a share of output, and the latest budget allocated $1.7 billion to multimodal parks and port connectivity. Industry groups welcome the intent but want faster land-acquisition clearances.

What it means for you

Shippers

Move to paperless clearance and book rail slots in advance; consider a second gateway for contingency.

Logistics providers

Invest in data integration with customs and ports; fragmented last-mile operators should consider consortium models.

Warehouse investors

Demand for bonded and temperature-controlled space near gateways outstrips supply; underwrite at current rents.

Buyers abroad

Ask suppliers for documented contingency routes and track transit via the new visibility tools as they roll out.

Companies and leaders in this story

Adani Ports Sun Pharma JSW Steel Tata Electronics Anita Deshmukh Amit Chandra

Frequently asked questions

To 60 hours at Cochin, from 62 hours a year earlier, driven mainly by paperless clearance and risk-based inspection.

Sources

  1. Ministry of Commerce & Industry: Monthly trade statistics and notifications
  2. Company filings and earnings calls: Disclosures on order books and capex
  3. Ministry-level press releases: Scheme guidelines and cabinet decisions
  4. Central Board of Indirect Taxes & Customs: Port-level clearance and dwell data

Mock content for demonstration. Names, figures and quotes are illustrative and not real reporting.

#Infrastructure#SupplyChain#Logistics#Ports#UnitedKingdom
MI
Written by

Meera Iyer

Senior Trade Correspondent, IGEN News

Covers bilateral trade corridors, customs reform and export finance. Previously a commodities desk reporter in Mumbai.

Source & Editorial Attribution

Ministry of Housing & Urban Affairs · IGEN Trade Intelligence

This article is curated and summarized by the IGEN editorial desk. All text is verified from official filings and trade bulletins, rendered strictly in plain text for compliance and clarity. Full text and regulatory updates are archived in the national registry.

Daily briefing

Get stories like this in your inbox

One concise email each morning on trade, policy and markets across Infrastructure and 49 other sectors.

Discussion (3)

Sort by: Most recent
Log in to comment
T
Tanvi Joshi
38m ago

Good to see concrete figures instead of generalities. The table on destination markets is especially helpful.

D
Deepa Nair
2h ago

Any word on how this plays out for services exporters? Would be a good follow-up.

A
Ankit Sharma
5h ago

The point about documentation holds true on the ground. Our forwarder has already seen holds from template mismatches.

In this article
  1. 1. What changed at the port
  2. 2. Rail, warehousing and the middle mile
  3. 3. The gaps that remain
  4. 4. Where the next savings are
  5. 5. Discussion (3)

Trending now

  1. 01Inside the Power Policy Reset: Winners, Losers and the 30-Day Countdown
  2. 02Analysis: Five Forces Shaping Semiconductors Trade Over the Next Three Years
  3. 03Rewiring the Banking Supply Chain: $3.4 billion of Capacity Moves Closer to the Customer
  4. 04Why Netherlands Is Becoming the Fastest-Growing Market for Indian Aerospace
  5. 05Nikhil Kamath on Building a Global Health and Family Welfare Business From India: "Patience Is a Strategy"
Topic
S36 · Infrastructure & Construction

Ministry of Housing & Urban Affairs

United KingdomSouth Korea

More to read

All headlines →
Policy · Power

Inside the Power Policy Reset: Winners, Losers and the 30-Day Countdown

8 min read
Expert · Semiconductors

Analysis: Five Forces Shaping Semiconductors Trade Over the Next Three Years

4 min read
Trade · Banking

Rewiring the Banking Supply Chain: $3.4 billion of Capacity Moves Closer to the Customer

7 min read
Country · Aerospace

Why Netherlands Is Becoming the Fastest-Growing Market for Indian Aerospace

5 min read
Leader · Health and Family Welfare

Nikhil Kamath on Building a Global Health and Family Welfare Business From India: "Patience Is a Strategy"

4 min read
Expert · Biotechnology

The Long Read: Biotechnology After the Tariff Reset

4 min read